happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_0913.jpg
Wall ImprefectionThe painter fixing a wall imperfection. dozer00000
(0 votes)
IMG_0900.jpg
Grouting the SkirtingGrouting the skirting and floor tiles. dozer00000
(0 votes)
IMG_0893.jpg
Grouted Tile SectionA completed and grouted section of tiles.dozer00000
(0 votes)
IMG_0890.jpg
Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer00000
(0 votes)
IMG_0889.jpg
Leveling the TilesLeveling the tiles in place after they are laid. dozer00000
(0 votes)
IMG_0877.jpg
True LineA true line indicating where the edge of the tile should be. dozer00000
(0 votes)
IMG_0872.jpg
Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozer00000
(0 votes)
IMG_0871.jpg
Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozer00000
(0 votes)
IMG_0869.jpg
Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozer00000
(0 votes)
IMG_0866.jpg
Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozer00000
(0 votes)
IMG_0865.jpg
Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozer00000
(0 votes)
IMG_0864.jpg
New Electric ReceptacleA new electric receptacle is established. dozer00000
(0 votes)
7141 files on 596 page(s) 184

Debug Info 
Debug Output: show / hide