Wall TilesThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer (0 votes)
|
|
FlintkoteAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozer (0 votes)
|
|
FlintkoteA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozer (0 votes)
|
|
CeilingPlastering up the joints and screw heads in the new ceiling.dozer (0 votes)
|
|
Preparing for New Control BoxPreparing the wiring for a new square D electrical panel.dozer (0 votes)
|
|
Electric in CeilingLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer (0 votes)
|
|
FlintkoteStarting to flintkote the floor area. dozer (0 votes)
|
|
Laying in the PlumbingEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozer (0 votes)
|
|
Removing Existing SinkThe above counter mount sink was removed and this granite counter will be removed.dozer (0 votes)
|
|
Existing Above Ceiling AreaThese pipes in the ceiling area are from the condo above. dozer (0 votes)
|
|
Tile RemovalThe tile removal took longer than anticipated.dozer (0 votes)
|
|
Don't Buy a ToiletDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozer (0 votes)
|
|