Granite Counter and Wood DoorsThe under mount sink and the granite counter top works nice in this condo. The wood doors on the bottom allow for easy access to the storage space below. Notice the tile trim piece is aluminum (as opposed to plastic trim).dozer (0 votes)
Installing the Wood StructureThe wood work is done offsite and then brought in and installed in pieces. The electric which feeds in will support the LED lighting. dozer (0 votes)
Wood FrameThe wood is teak plywood on top of a frame made of furniture wood.dozer (0 votes)
Granite SkirtingInstalling and adjusting the position of the granite skirting on the front of the under mount sink.dozer (0 votes)
SinkThe sink is left to dry after it is installed along with the granite counter top.dozer (0 votes)
Adhesive Concrete MixApplying an adhesive concrete mix to support the granite skirting.dozer (0 votes)
Granite Faucet HoleOn site drilling of the faucet hole for the granite counter.dozer (0 votes)
Toilet AdjustorThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer (0 votes)
Trim PieceInstalling the aluminum trim piece.dozer (0 votes)
Floor LevelThe floor is poured level in preparation of the floor tiles.dozer (0 votes)
Wall TileWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer (0 votes)
Installing Square D PanelInstalling the 6 station square D panel.dozer (0 votes)