happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSC04778_(Medium).JPG
zappa44444
(1 votes)
quality__wiring.JPG
Quality wiringThis is a major wiring junction in the roof space. Wires twisted together with insulating tape and no junction box.1 commentsjazzman44444
(1 votes)
Downlight.jpg
DownlightWe used these recessed ceiling downlights throughout the house. They'll take normal bulbs or energy-savers. Cost: Baht 38 each in GlobalHouse.jazzman44444
(1 votes)
3D_House06.jpg
Right Sidepklongball44444
(1 votes)
IMG_3064.JPG
clean waterwe have clean water, after a day of muddy waterMax&Bee-in-CM44444
(2 votes)
05_6_-_1.JPG
The House - 1The house looking up from the river bankteevee33333
(3 votes)
IMG_2209a.jpg
2/6/2007 12:41Here is how the house looks today. tcth33333
(7 votes)
IMG_1393a.jpg
Laying Tiles in the Entry RoomTiles being laid in the Entry room.dozer33333
(2 votes)
IMG_3972.JPG
Rebar Frame Work for Beam #3This is the rebar framework which will go in the top horizontal beam, located at a distance of 3 m. - 3.2 m from the floor level.
dozer33333
(2 votes)
IMG_3913_small.jpg
KitchenKitchenkknaj33333
(2 votes)
31.JPG
rmambour99933333
(2 votes)
Roof_Insulation.jpg
Aluminium foil insulation.This is most effective (Australian & Californian university research) when installed directly under the tiles.jazzman33333
(2 votes)
7141 files on 596 page(s) 10

Debug Info 
Debug Output: show / hide