June 12I just had to add this photo of Mrs. PK trying her hand at mixing the mud for the tile crew. She lasted all of 2 minutes before her arms gave out.pklongball (0 votes)
June 12Column rendering and the partial counter and cabinet built in the back. This cabinet will house the gas bottles, storage and a shoe rack2 commentspklongball (0 votes)
June 12Now we have a finished set of steps in the front. I am quite pleased with this outcome. The addition of aluminum noses on the stairs is a nice safety featurepklongball (0 votes)
June 12The rear side steps to the balcony and the newly finished tile and aluminum noses on the stairspklongball (0 votes)
June 12Now the second bath floor is almost finished. Just some grout work to do.pklongball (0 votes)
June 12Another inside view of the second bath and the floor and now partially built vanity for the sink.pklongball (0 votes)
June 12The tile man is laying some tile at the master bedroom door . The window crew is coming o install the fram and this needs to be done todaypklongball (0 votes)
June 12The wall man is adding the finish to the now completed column in the backpklongball (0 votes)
June 8I will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongball (0 votes)
June 7More of the crew adding the sand wash to the rear stepspklongball (0 votes)
June 7A different angle but the same day and more of the same sand wash stepspklongball (0 votes)
June 7Today the wall crew came around to render the unfinished areas under the balconies that were not complete beforepklongball (0 votes)