21 March 2009Its hard to see in this photo but my interest is the aircon tubing and cables that we had installed today. Right now its kind of hanging out in nowhere until the wall gets built.pklongball (1 votes)
21 AprilThis is the view most visitors to the area will see when coming from the main entry of the projectpklongball (0 votes)
21 AprilBack view of the place as of todaypklongball (0 votes)
21 AprilNow some work has started on the back veranda stairway. A base layer of concrete was poured today.pklongball (0 votes)
21 AprilHere we have a gable now with all the Sherawood applied. The yellow color is the Shera unfinished out of the box color. We will paint it and the trim wood will get finish too.pklongball (0 votes)
18 AprilWhat else but another view of the gables. I guess some may think I'm obsessed with this but it cost a lot to build this roof and gables versus the traditional hip roof. A lot!pklongball (0 votes)
18 AprilA look at the plastered side and back wallspklongball (0 votes)
18 AprilFull view of the new door framepklongball (0 votes)
18 AprilHere is an inside look at the top of the new front door frame. This was set late yesterday and now the wall crew is busy walling and blocking in the frame.pklongball (0 votes)
18 AprilAnd again an inside look up to the gables and the application of the screening and Shera.pklongball (0 votes)
18 AprilBack view of the place. We/I am pleasingly surprised that Songkran is almost over and I think the work really never stopped. It was slow for a few days and I think they only really took 2 days off. Today the crew is in full steam. The weather is very hot today. 36 on my thermometer and 70% humid. Rain is forecast for tomorrow. I hope.pklongball (0 votes)