21 March 2009This view of the pre-wired AC for the master bedroompklongball (0 votes)
21 March 2009I included a view of the pre-wired aircon so I can remember where the wires and pipes are located for future needspklongball (0 votes)
17 March 2009Sparky and helper installing a pipe and boxpklongball (0 votes)
17 March 2009The wall building is interrupted to allow the electrician "Sparky" and helper to install the boxes and conduits for the plugs and switches inside the wall cavity. From now til the Sparky finishes this part they will work together. We can also see the roof crew is moving tiles to the roof area for installation.pklongball (0 votes)