|
Top rated - Phala - "The Walls" |
11 March 2009More block to be installedpklongball (1 votes)
|
|
9 March 2009This is the beginning of the wall work. Nothing dramatic yet but needs to be done. Two ladies were assigned the job of moving the 2,000 odd blocks onto the floor area in selected places to make them ready for the wall team to start installing them.pklongball (1 votes)
|
|
6 March 09'Today the Q-Con blocks were delivered to the site. Total on the truck was 2,000 blocks. The walls will begin soon.pklongball (2 votes)
|
|
15 AprilTwo of the team loading the powder mix and water into the bread mixer. When this dough comes out it is ready to apply to the walls and make the nicest, smoothest plaster I've seen. They are very happy the weather is more humid and wet now as the rendering process comes out better if the stuff does not dry too quickly.pklongball (0 votes)
|
|
15 AprilHere we have a machine not seen by too many people I'm sure. My builder uses this bread dough mixer to mix his render or plaster to an absolute smooth consistency. When they apply this stuff it is really smooth and easy to work withpklongball (0 votes)
|
|
15 AprilOne of the crew getting ready to make a batch of bread? Preparing the hopper for the plaster is what she is doing.pklongball (0 votes)
|
|
15 AprilIn the bedroom area one of the lady plasterers is applying the finishing touches to the new coating.pklongball (0 votes)
|
|
15 AprilA little closer view of a recently plastered wall. They really do a nice job.pklongball (0 votes)
|
|
15 AprilA shot of the plaster crew loading in a batch of water and plaster to the mixer. The mix really comes out nicepklongball (0 votes)
|
|
15 AprilThe back veranda and the plaster work they just finished.pklongball (0 votes)
|
|
15 AprilA look down the side of the kitchen wall and the back veranda showing the newly plastered walls.pklongball (0 votes)
|
|
15 AprilMaster bedroom. One wall is plastered and one wall needs to be done yet.pklongball (0 votes)
|
|
54 files on 5 page(s) |
1 |
|
|
|
|
|
|