House layoutThe plan calls for the house and car park and pool. We can only afford the house and carpark now. The pool will be added later depending on the economypklongball (1 votes)
House floorplanThis was the last drawing of the floor plan from the architect. We already have made a couple of changes to the master bath(pushed the wall out about 50cm) and the kitchen/office wall will push out about 100 cm to enlarge the kitchen mainlypklongball (0 votes)
50 percent of the wallHere we see two side walls built with the back and front yet to go. The price of the plot included a complete wall and gate. It is the poorest, cheapest wall money can buy but if it lasts a couple of years I'll be happy.pklongball (0 votes)
Walled in?The beginning of the perimeter wall build.
Water main & construction powerJust after land transfer the project saw the government water main installation so we may have a meter installed before we begin mixing cement. We also had the PEA install a temporary meter for our electric needs during the build.pklongball (0 votes)
Plot cleared second timeThe seller would run a machine around the project area to keep the jungle down to a manageable size before transfer.
Ready to build onThis is the final view of the plot before any work on the wall or the house. We have a 50 percent share of that electric pole in place.
New Land - October 2007We made the first payment on the lot in October of 07' . I marked up a photo to show the basic size of the plot. There were a few trees still standing at thee beginning but they will all be gone at the build stagepklongball (0 votes)
Khun Apple measuring the layoutKhun Apple is just starting the measurement process for the house layout.
Ready for final prepThis shot of a hole is waiting the ladies and their final handiwork to prepare this hole and others for the concrete and rebar work.
18 Dec.'08pklongball (0 votes)