DSC02010_-_Assembling_Column_Rebar_Cage_-_112007.JPG
Assembling the rebar cages for the columns. Rick B00000
(0 votes)
DSC02017_-_After_Concrete_Yap_in_Footer_Hole_-_112207.JPG
This is a double pile footer arrangement. A single column will come out of this hole.Rick B00000
(0 votes)
DSC02019_-_After_Concrete_in_Footer_Hole_-_112207.JPG
Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B00000
(0 votes)
DSC02030_-_Raising_Second_Column_-_112207.JPG
Raising the ceremonial columns. Our ceremony involved two columns.Rick B00000
(0 votes)
0009_-_Laying_Out_Footers_-_100207.jpg
Laying out the pile locationsRick B00000
(0 votes)
0012_-_Delivering_Piles_-_110307.JPG
Piles being deliveredRick B00000
(0 votes)
0014_-_Driving_Piles_-_110307.JPG
Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B00000
(0 votes)
DSC01997_-_Locating_Footers_-_111507.JPG
Laying out the footer locations and dimensionsRick B00000
(0 votes)