View of side deckRick BJan 20, 2009
|
|

Rear and side view of houseRick BJan 20, 2009
|
|

The family chedi in the back yardRick BJan 20, 2009
|
|

View of driveway just pouredRick BJan 20, 2009
|
|

| Random files - Rick B's Gallery |
|
|

Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick B
|
|

Front of house during renderingRick B
|
|

Floor slabs (pan peun) are being laid for the first floor. These slabs will be covered with wire mesh and an additional 5cm of poured concrete.Rick B
|
|
|
|

Inside kitchen after being tiledRick B
|
|
|

Finished car port and storage/wash roomRick B
|
|

|
|
|