Last additions - Rick B's Gallery |

View of side deckRick BJan 20, 2009
|
|

Rear and side view of houseRick BJan 20, 2009
|
|

The family chedi in the back yardRick BJan 20, 2009
|
|

View of driveway just pouredRick BJan 20, 2009
|
|

Random files - Rick B's Gallery |

Side and rear after rendering wallsRick B
|
|

Pouring and smoothing concrete for the garage and storage roomRick B
|
|

Wooden staircase railing in progressRick B
|
|

Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B
|
|

Floor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B
|
|

Front view of house after columns were enlarged with bricksRick B
|
|

Blocks installed on top of ground level beam to enclose the crawl spaceRick B
|
|

Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B
|
|

|
|
|