happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Rick B

Rick B's House


51_-_Side_Deck_-_091908.JPG

Progress photos of our house construction in Sam Chuk, Suphanburi.

92 files, last one added on Jan 20, 2009
Album viewed 178 times

 

1 albums on 1 page(s)

Last additions - Rick B's Gallery
51_-_Side_Deck_-_091908.JPG
View of side deck1 commentsRick BJan 20, 2009
52_-_Side_and_Rear_-_091908.JPG
Rear and side view of houseRick BJan 20, 2009
53_-_Chedi_-_091908.JPG
The family chedi in the back yard1 commentsRick BJan 20, 2009
46_-_Concrete_Driveway_-_072208.JPG
View of driveway just pouredRick BJan 20, 2009

Random files - Rick B's Gallery
7_-_Side_and_Rear_Rendered__-_051908.JPG
Side and rear after rendering wallsRick B
45_-_Garage_Paving_-_072608.JPG
Pouring and smoothing concrete for the garage and storage roomRick B
38_-_Stairs_-_062908.JPG
Wooden staircase railing in progressRick B
0014_-_Driving_Piles_-_110307.JPG
Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B
DSC02164_-_Floor_Slabs_-_010808.JPG
Floor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B
2_-_Front_View_-_042108.JPG
Front view of house after columns were enlarged with bricksRick B
DSC02067_-_Lower_Block_Work_around_house_-_112907.JPG
Blocks installed on top of ground level beam to enclose the crawl spaceRick B
DSC02019_-_After_Concrete_in_Footer_Hole_-_112207.JPG
Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B