happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

Top rated - View Talay 2 Condo
IMG_3249.jpg
SinkThe sink is left to dry after it is installed along with the granite counter top.dozer00000
(0 votes)
IMG_3248.jpg
Adhesive Concrete MixApplying an adhesive concrete mix to support the granite skirting.dozer00000
(0 votes)
IMG_3246.jpg
Granite Faucet HoleOn site drilling of the faucet hole for the granite counter.dozer00000
(0 votes)
IMG_3215.jpg
Toilet AdjustorThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer00000
(0 votes)
IMG_3203.jpg
Trim PieceInstalling the aluminum trim piece.dozer00000
(0 votes)
IMG_3200.jpg
Floor LevelThe floor is poured level in preparation of the floor tiles.dozer00000
(0 votes)
IMG_3189.jpg
Wall TileWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer00000
(0 votes)
IMG_3159.jpg
Installing Square D PanelInstalling the 6 station square D panel.dozer00000
(0 votes)
IMG_3158.jpg
Wall TilesThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer00000
(0 votes)
IMG_3152.jpg
FlintkoteAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozer00000
(0 votes)
IMG_3151.jpg
FlintkoteA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozer00000
(0 votes)
IMG_3147.jpg
CeilingPlastering up the joints and screw heads in the new ceiling.dozer00000
(0 votes)
35 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide