happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > Kiang Talay Condo

Top rated - Kiang Talay Condo
IMG_0890.jpg
Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer00000
(0 votes)
IMG_0889.jpg
Leveling the TilesLeveling the tiles in place after they are laid. dozer00000
(0 votes)
IMG_0877.jpg
True LineA true line indicating where the edge of the tile should be. dozer00000
(0 votes)
IMG_0872.jpg
Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozer00000
(0 votes)
IMG_0871.jpg
Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozer00000
(0 votes)
IMG_0869.jpg
Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozer00000
(0 votes)
IMG_0866.jpg
Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozer00000
(0 votes)
IMG_0865.jpg
Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozer00000
(0 votes)
IMG_0864.jpg
New Electric ReceptacleA new electric receptacle is established. dozer00000
(0 votes)
IMG_0838.jpg
Height of TileThe red chalk line is established by measuring down from the level line.dozer00000
(0 votes)
IMG_0833.jpg
Tile: Level LineA level line is being determined for laying the tile. dozer00000
(0 votes)
IMG_0816.jpg
Prepping to PrimerGetting the wall ready to primer. The upper trim is kept, caulking is being applied to the between the concrete ceiling and the trim. Wall paper is being scrapped off. dozer00000
(0 votes)
31 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide