Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozer (0 votes)
|
|
Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer (0 votes)
|
|
Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer (0 votes)
|
|
Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozer (0 votes)
|
|
Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozer (0 votes)
|
|
Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozer (0 votes)
|
|
Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer (0 votes)
|
|
Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer (0 votes)
|
|
Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozer (0 votes)
|
|
Wall ImprefectionThe painter fixing a wall imperfection. dozer (0 votes)
|
|
Grouting the SkirtingGrouting the skirting and floor tiles. dozer (0 votes)
|
|
Grouted Tile SectionA completed and grouted section of tiles.dozer (0 votes)
|
|
|
|
|
|