Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozer (0 votes)
Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer (0 votes)
Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer (0 votes)
Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozer (0 votes)
Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozer (0 votes)
Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozer (0 votes)
Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer (0 votes)
Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer (0 votes)
Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozer (0 votes)
Wall ImprefectionThe painter fixing a wall imperfection. dozer (0 votes)
Grouting the SkirtingGrouting the skirting and floor tiles. dozer (0 votes)
Grouted Tile SectionA completed and grouted section of tiles.dozer (0 votes)