Front valley looks pretty poor after the first try. This will need to be reworked since the tiles do not come together in a nice clean straight cut line. dozer (0 votes)
Front valley being completed. (30-Apr-04) dozer (0 votes)
This shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer (0 votes)
The tile is laid over aluminium drainage sheets in the valley section. dozer (0 votes)
Working on the front roof valley of the house. (28-Apr-04)dozer (0 votes)
Close-up of underside of roof section. dozer (0 votes)
Main roof section nearing completion. (27-Apr-04)dozer (0 votes)
Cement work on the roof tiles. (26-Apr-04)dozer (0 votes)