Front Brick ColumnsThe front brick columns sit on either side of the drive way. The columns contain the electric conduit which is run up to the top to support the exterior wall lighting. The inside of the columns is filled with concrete.dozer (0 votes)
|
|
Driveway PourIn preparation for the driveway pour the surface is leveled for the correct sloping angle and then the frame mesh is put in place at intervals of 20 centimeters. The red bricks are used as spacers. The pour will be 10 centimeters in depth. dozer (0 votes)
|
|
Driveway Pour in ProcessHand mix was used on the driveway. Red bricks are used as a starting spacer to ensure that the rebar mesh doesn't sit on the ground, further adjustment is done by the 'pull into place method' as the pour progresses. The meshing is pulled to be centered within the 10 centimeter pour.dozer (0 votes)
|
|
Water Flow TestThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozer (0 votes)
|
|
Water Flow Test and Drainage PVCThe drainage PVC has been installed in the proper places to allow the water to exit the site, as evidenced during this flow test. dozer (0 votes)
|
|
Walkway PourIn preparation for the walkway pour there is a rebar mesh put in place with spacing every 20 centimeters. dozer (0 votes)
|
|
Poured WalkwayThe view after the walkway pour prior to the final smoothing of the concrete. This is hand mix concrete, you can tell it is about the right consistency since there is a minimum of water near the surface, and will become further evident during the final smoothing process. dozer (0 votes)
|
|
|
|
|
|
|