Top rated - Plumbing |
PVC Pipe Joined to Tested SectionThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozer (0 votes)
|
|
Finished Submerged Water TankThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer (0 votes)
|
|
Lanko K11 WaterproofingThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer (0 votes)
|
|
Sloped Bathroom FloorsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozer (0 votes)
|
|
Water HeaterThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozer (0 votes)
|
|
Service Opening Water TankThe finished and plumbed water tank with the automatic pump on top. dozer (0 votes)
|
|
Tank ServiceThe inside of the tank being cleaned of any debris.dozer (0 votes)
|
|
Proper Leveling of ToiletThe toilet being check for level during installation.dozer (0 votes)
|
|
Septics after PourThe service openings are placed to be level with the walkway. dozer (0 votes)
|
|
Rebar Framing for Water TankThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer (0 votes)
|
|
Framework for Water TankAnother view of the frame work lattice which sits on top of 6 small footings. The framework is centered to be within the external wall using red bricks a spacers.dozer (0 votes)
|
|
Sika Water ProoferSika 'gan sum' waterproofing agent is added to the concrete mix.dozer (0 votes)
|
|
|
|
|
|