SepticsThere are overall three septics, each consists of five one meter diameter concrete rings with a four centimeter surrounding gravel pad.dozer
|
|
Plumbing Drain PipesThis shows what is to be the bathroom floor. Note the 4" solid waste drain and 2" shower drain. The smaller diameter pvc pipes are the pressurized water service pipes which will run from the automatic pump to the inbound fitting within the wall of the house.dozer
|
|
Pipes CappedNotice that in this shot the damp course has been put in place along with the support rebar for the floor pour. All drain pipes + inbound water pipes have been properly 'capped' (see the end of the PVC pipe) with a removable 'hat'. This will prevent any concrete contamination from entering and restricting flow within the pvc piping during the construction process. dozer
|
|
Pipes after Floor PourA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
|
|
Pressurized Water Pipe TestA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozer
|
|
Capped PipesClose up of the caps temporarily used on the drain pipes.dozer
|
|
Drain Pipe TestDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozer
|
|
Hole for Submerged Water TankThis shows the start of the 1800 liter underground water tank. dozer
|
|
Septic Service OpeningThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozer
|
|
Septics Prior to Walkway PourThis shows the septics prior to the walkway being poured. dozer
|
|
Septics after PourThe service openings are placed to be level with the walkway. dozer
|
|
Rebar Framing for Water TankThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer
|
|
|
|
|
|