Home > House Construction > Chok Dee #2 > Plumbing

IMG_8654.jpg
SepticsThere are overall three septics, each consists of five one meter diameter concrete rings with a four centimeter surrounding gravel pad.dozer
IMG_8666.jpg
Plumbing Drain PipesThis shows what is to be the bathroom floor. Note the 4" solid waste drain and 2" shower drain. The smaller diameter pvc pipes are the pressurized water service pipes which will run from the automatic pump to the inbound fitting within the wall of the house.dozer
IMG_8679.jpg
Pipes CappedNotice that in this shot the damp course has been put in place along with the support rebar for the floor pour. All drain pipes + inbound water pipes have been properly 'capped' (see the end of the PVC pipe) with a removable 'hat'. This will prevent any concrete contamination from entering and restricting flow within the pvc piping during the construction process. dozer
IMG_8769.jpg
Pipes after Floor PourA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
IMG_8814.jpg
Pressurized Water Pipe TestA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozer
IMG_8843.jpg
Capped PipesClose up of the caps temporarily used on the drain pipes.dozer
IMG_8851.jpg
Drain Pipe TestDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozer
IMG_9029.jpg
Hole for Submerged Water TankThis shows the start of the 1800 liter underground water tank. dozer
IMG_9044.jpg
Septic Service OpeningThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozer
IMG_9045.jpg
Septics Prior to Walkway PourThis shows the septics prior to the walkway being poured. dozer
IMG_9062.jpg
Septics after PourThe service openings are placed to be level with the walkway. dozer
IMG_9129.jpg
Rebar Framing for Water TankThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer