|

Top rated - Granite Works |

Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozer     (0 votes)
|
|

Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer     (0 votes)
|
|

Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer     (0 votes)
|
|

Final CracksAny slight openings are grouted by the installers.dozer     (0 votes)
|
|

Concrete SlurryThe mix used to concrete the granite counter top to the base.dozer     (0 votes)
|
|

Setting Bathroom Top in PlaceSetting the bathroom granite into place. dozer     (0 votes)
|
|
|
|
|

|
|
|