Home > House Construction > Cool Thai House Phase 2 > Granite Works

IMG_2489.jpg
Setting Bathroom Top in PlaceSetting the bathroom granite into place. dozer
IMG_2490.jpg
Concrete SlurryThe mix used to concrete the granite counter top to the base.dozer
IMG_2491.jpg
Final CracksAny slight openings are grouted by the installers.dozer
IMG_2492.jpg
Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer
IMG_2494.jpg
Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer
IMG_2495.jpg
Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozer
IMG_2505.jpg
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozer
IMG_2506.jpg
Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozer
IMG_2508.jpg
Undermount Sink Held in PlaceThe under mount sinks are secured in place after the granite is set and left to dry. dozer
Photo-0021.jpg
Desks Ready for Granite TopThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer
IMG_2943.jpg
Adjusting the Counter TopThe countertop being adjusted. dozer
IMG_2945.jpg
Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozer