happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Granite Works

Top rated - Granite Works
DSCN0448.jpg
Undermount Ceramic SinkAn undermount ceramic sink. The granite is cut at the factory using the actual sink as a guide.dozer00000
(0 votes)
DSCN0445.jpg
Undermount Stainless SinkAn undermount stainless sink.dozer00000
(0 votes)
DSCN0419.jpg
Finished EdgeThe finished and grouted edge/corner of the granite counter top. dozer00000
(0 votes)
IMG_2508.jpg
Undermount Sink Held in PlaceThe under mount sinks are secured in place after the granite is set and left to dry. dozer00000
(0 votes)
Photo-0021.jpg
Desks Ready for Granite TopThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer00000
(0 votes)
IMG_2950.jpg
Desk FittingThe installer adjusting the cut and edged granite to have the same overhang on all sides. dozer00000
(0 votes)
IMG_2948.jpg
DeskOne desk with the granite top installed, the other ready to go. dozer00000
(0 votes)
IMG_2947.jpg
Silicone AdhesiveUsing sony brand silicone adhesive to glue the granite top to the desk. dozer00000
(0 votes)
IMG_2945.jpg
Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozer00000
(0 votes)
IMG_2943.jpg
Adjusting the Counter TopThe countertop being adjusted. dozer00000
(0 votes)
IMG_2506.jpg
Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozer00000
(0 votes)
IMG_2505.jpg
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozer00000
(0 votes)
18 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide