Home > House Construction > Cool Thai House Phase 2 > Secured Storage Room

Top rated - Secured Storage Room
DSCN0470.jpg
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozer00000
(0 votes)
DSCN0471.jpg
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozer00000
(0 votes)
IMG_2566.jpg
Finished Secured Metal PartitionThe completed metal partition with door. dozer00000
(0 votes)
IMG_2528.jpg
Rear WindowThe secured rear opening. dozer00000
(0 votes)
IMG_2179.jpg
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer00000
(0 votes)
IMG_2178.jpg
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer00000
(0 votes)
IMG_2177.jpg
Partial DoorThe beginning of the door and lower panel. dozer00000
(0 votes)
IMG_2158.jpg
Guide LinesEstablishing a guide line for the cross supports. dozer00000
(0 votes)
IMG_2124.jpg
Welding Lower BeamWelding the lower beam in place. dozer00000
(0 votes)
IMG_2122.jpg
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozer00000
(0 votes)
IMG_2118.jpg
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer00000
(0 votes)
IMG_2112.jpg
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer00000
(0 votes)