Double WallThe double wall has a layer of poured re enforced concrete in the middle. dozer
Walls ReinforcedThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozer
Working on Top MeshThe top metal mesh work is additionally welded to the roof structure for support. dozer
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozer
Welding Lower BeamWelding the lower beam in place. dozer
Guide LinesEstablishing a guide line for the cross supports. dozer
Partial DoorThe beginning of the door and lower panel. dozer
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer