Home > House Construction > Cool Thai House Phase 2 > Secured Storage Room

IMG_1950.jpg
Double WallThe double wall has a layer of poured re enforced concrete in the middle. dozer
IMG_1963.jpg
Walls ReinforcedThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozer
IMG_2075.jpg
Working on Top MeshThe top metal mesh work is additionally welded to the roof structure for support. dozer
IMG_2112.jpg
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
IMG_2118.jpg
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer
IMG_2122.jpg
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozer
IMG_2124.jpg
Welding Lower BeamWelding the lower beam in place. dozer
IMG_2158.jpg
Guide LinesEstablishing a guide line for the cross supports. dozer
IMG_2177.jpg
Partial DoorThe beginning of the door and lower panel. dozer
IMG_2178.jpg
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer
IMG_2179.jpg
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer
IMG_2528.jpg
Rear WindowThe secured rear opening. dozer