happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Ceiling

Top rated - Ceiling
IMG_2530.jpg
Aluminum Rail FrameworkInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozer00000
(0 votes)
IMG_2511.jpg
Exterior Ceiling FrameInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer00000
(0 votes)
IMG_2510.jpg
Setting in the Cross SupportsSetting the cross supports into place for the exterior ceiling.dozer00000
(0 votes)
IMG_2401.jpg
Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer00000
(0 votes)
IMG_2400.jpg
Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozer00000
(0 votes)
IMG_2398.jpg
Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozer00000
(0 votes)
IMG_2391.jpg
Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozer00000
(0 votes)
IMG_2389.jpg
Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer00000
(0 votes)
IMG_2375.jpg
Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer00000
(0 votes)
IMG_2368.jpg
Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer00000
(0 votes)
IMG_2367.jpg
Level Establish for Outer StepThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozer00000
(0 votes)
IMG_2361.jpg
Drywall Sheeting AppliedThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozer00000
(0 votes)
27 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide