IMG_2350.jpg
Interior: FrameworkThe interior framework is established for the drywall sheeting to be installed. The very beginning of the process is establishing a straight line for every level to be used (if there is a step there would be the step level and the main level). This is done using the water clear tubing method and then setting the level lines in red chalk.dozer
IMG_2351.jpg
Ceiling Secured RoomThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozer
IMG_2352.jpg
Bedroom InstallationThe first thing done is that the level of the lower step of the ceiling is established around the outside perimeter. The frame is being set up for a lower step which extends outward 60 centimeters and is 15 centimeters deep. dozer
IMG_2361.jpg
Drywall Sheeting AppliedThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozer
IMG_2367.jpg
Level Establish for Outer StepThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozer
IMG_2368.jpg
Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
IMG_2375.jpg
Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer
IMG_2389.jpg
Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer
IMG_2391.jpg
Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozer
IMG_2398.jpg
Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozer
IMG_2400.jpg
Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozer
IMG_2401.jpg
Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer