Top rated - Chiyman's Low Cost House - Part 3 - First Floor beams and slab
Finishing the first floor slab concretechiyman (1 votes)
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiyman (0 votes)
Pre Cast Concrete slabs being unloaded directly to the first floor beamschiyman (0 votes)
First Floor Concrete beams with partial removal of formwork ready for receiving the precast first floor slabs. I was very happy with the quality of the beams.chiyman (0 votes)