July 1The finishing stages of placing the driveway curbingpklongball (0 votes)
July 6We had a pretty heavy rain overnight and this is the stading water from that storm. We will need to re-grade this area to drain a bit better. Tractor man promised us some available time yet.pklongball (0 votes)
July 6Double width pad area for the two compressorspklongball (0 votes)
July 6Compressor and electric wiring for the guest bedroom AC and the living room ACpklongball (0 votes)
July 6Outdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongball (0 votes)
June 30The delivery of the curbing for the driveway. 105 each of the 50 cm long precast blockspklongball (0 votes)
June 30The delivery of the precast curbing for the gravel drivewaypklongball (0 votes)
June 28Gravel truck one of threepklongball (0 votes)
June 28Here is the first load of gravel that will line the driveway. I am expecting two trucks for sure and maybe a third. The dirt man will decide if the 3rd is needed when he levels it and compacts it.pklongball (0 votes)
June 28Here is a view of the JCB loading the small dump truck with the junk dirt and other construction debris and weeds.pklongball (0 votes)
June 28Mrs PK starting a dig. I hope she finds a pot of goldpklongball (0 votes)
June 28Mrs PK digging in the dirt. She wants to move some small plants and other stuff from our rental house.pklongball (0 votes)