Home > House Construction > Chok Dee #1

Most viewed - Chok Dee #1
IMG_4054.JPG
Vent Tiles238 viewsThis type of special tile is to vent the plumbing appliances up through the roof. All of the vents for this project ascend through the interior walls and will be vented jointly out of this one roof tile.dozer
DSC03189.JPG
Fascia Board237 viewsThe fascia board being applied. It fits nicely in a groove under this CPAC monier roof tiles. The bird guard is applied while this fascia board is being applied. dozer
0803050305ExtRearRight.jpg
External from the Right Rear236 viewsThe bathroom wall will have glass blocks inserted at select locations to let natural light in. The lower level blocks are opaque and are in the shower stall itself. dozer
IMG_3980.JPG
Beam #3236 viewsThis shows beam #3, the top most part of the load bearing walls, after being bored. This beam had 2 lengths of 12mm rebar run horizontally throughout. Note that the electric conduit and vent pipes extend vertically through the beam.
dozer
IMG_3978.JPG
Form Work for Beam #3236 viewsThe wood form work is put in place for the concrete pour of the final (third) horizontal beam at a height of 3 m. to 3.2 m.
dozer
DSC03291.jpg
Front View231 viewsThe driveway is large enough for any size pickup. Note on the front perimeter wall there are openings with lights on the top. The wall is done in a natural 'no paint' pigment finish.dozer
IMG_3991.JPG
Metal Welding Surface230 viewsA piece of metal will be secured in place around the top of the top horizontal beam to provide a surface for welding on the roof structure.
dozer
IMG_3974.JPG
Primed and Painted Roof Metal227 viewsEach piece of roof metal is painted first with a primer coat and then sealed for maximum rust protection. This is a precaution which should be taken since the integrity of the metal is important in regards to the strength of the roof structure.dozer
2008_07_23_G9_0020.jpg
Bathroom222 viewsThe bathroom is large, about 2 x 3 meters. This shows the sink, toliet and the shower stall. There are blue glass blocks used to allow natural light to enter.dozer
IMG_3616.JPG
Water Septic #2219 viewsThe deeper second dirty water septic will be about 2 meters deep.
dozer
IMG_3793.JPG
Power Point Opening219 viewsAn opening for a 4 receptacle power point in a designated empty hole within the load bearing wall.
dozer
IMG_3843.JPG
External Power Point + Switch Box215 viewsThis shows holes where an external power point and switch box will be located.
dozer
219 files on 19 page(s) 8