IMG_4187.JPG
Render Brush276 viewsThe brush is used during the render application to sprinkle water on the render as it is starting to dry, then it is polished with a cement trowel.dozer
DSC03165.JPG
Roof Tiles274 viewsLaying roof tiles in place up to the roof valley.dozer
IMG_3972.JPG
Rebar Frame Work for Beam #3273 viewsThis is the rebar framework which will go in the top horizontal beam, located at a distance of 3 m. - 3.2 m from the floor level.
dozer
IMG_3916.JPG
Form Work for Beam #2273 viewsThe formwork for the pour of the beam. Note the 12mm rebar laid horizontally within the beam is wire tied to each vertical piece of rebar.
dozer
IMG_4173.JPG
Front of House273 viewsThe non consistency of the external render color coat gives a homey feel to the project.dozer
IMG_3939.JPG
Oversize Cinderblock Laying Proceeds271 viewsThe block laying proceeds on top of the second horizontal beam. Note the vertical vent PVC pipes extend upward through designated holes in the blocks.
dozer
IMG_4025.JPG
Exterior of Roof Structure269 views1 inch square metal is used as a surface on which to lay the tiles.
dozer
IMG_3966.JPG
Partially Constructed Bathroom Wall268 viewsThis shows the bathroom wall under construction. Note the openings for bathroom windows. There is a horizontal beam (#2) below the window level and 20 cm. lintel above. dozer
IMG_3915.JPG
Horizontal Beam #2 being Poured266 viewsThe second horizontal support beam is being poured at a height of 2.10 meters (above the window line). These beams are tied in with the vertical columns to give horizontal strength to the design.
dozer
IMG_4044.JPG
Protective Plastic Bird Guard265 viewsThere will be two sheets of the facia board upon which the lip of the tile rests. A protective screen which is designed to sit right under the tile, is placed between the two pieces of facia to eliminate any problems with entry from birds or other pests. dozer
IMG_4117.JPG
Depth Indicator264 viewsA depth of render indicator is plastered in place prior to render application. This is used to determine the thickness of the render to be applied. dozer
DSC03184.JPG
Horizontal Wall Beam263 viewsA horizontal concrete beam right after being poured.dozer