|
Most viewed - Original Coolthaihouse Build |
25 viewsFitting a door in place. (22-Jun-04)dozer
|
|
25 viewsAll of the wood windows have an opening mechanism as pictured here. The window can be opened and closed without having to open the screen. The window is opened by pushing the rod, and closed by pulling it. There is also a locking mechanism on the top of the windows (not shown) which allows the windows to be locked without opening the screen.dozer
|
|
25 viewsClose up of the dinner guest.dozer
|
|
25 viewsUpdate 02-Sep-04: Here is the road on a rainy day. Even though the water puddles a bit it is no problem on the areas covered with road stone, since these stones act almost as good as a paved road. The puddles don't get much bigger than this and then the water runs off. (02-Sep-04)dozer
|
|
25 viewsUpdate 02-Sep-04: Inside view of the yard of the 'too low' house, after rain.dozer
|
|
25 viewsThe repaired roof valley. This was kind of a struggle due to inadequate valley aluminum which was then compensated for by using two pieces which are welded together. In any event the valley now looks good and there is no problem with water leakage. (02-May-04)dozer
|
|
25 viewsThe house has 5 variable mounted roof fans and 35 down lights. In this room the down lights are on dimmer switches. All of the down lights as well as all of the electric is 'grounded'. (18-Jun-04)dozer
|
|
25 viewsThe bathtub being framed in the large bathroom. It will be supported by 4 columns of red bricks and will be enclosed in tile. There are still two more columns of bricks to be added. (25-Jun-04)dozer
|
|
25 viewsThe metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
|
|
25 viewsA septic being dug. (22-Apr-04)dozer
|
|
25 viewsThe hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
|
|
25 viewsSmall bathroom hot and cold water for the shower stall.dozer
|
|
420 files on 35 page(s) |
|
|
|
|
|
9 | |
|
|
|
|
|
|
|