Most viewed - Original Coolthaihouse Build |
27 viewsStucco is what gives strength to the wall. Notice the thickness of the stucco shown here. This is the front exterior wall. (17-Apr-04)dozer
|
|
27 viewsKitchen floor tile. (26-May-04)dozer
|
|
27 viewsHere is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer
|
|
27 viewsConcrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer
|
|
27 viewsThis electrical in the front on the left of the gate is used to split off the electrical to feed the perimeter wall lighting and the pumps.dozer
|
|
27 viewsBy using the wrong material to finish of the well, large pockets of air and water form - which put pressure on the sides of the well. Here is the well after the blocks were dug out. The footing will have the rebar supports at 2.5 meter intervals. dozer
|
|
26 viewsThis shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer
|
|
26 viewsAn embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozer
|
|
26 viewsThis is the view of palm trees out the right side window of the house. (24-Jan-04)dozer
|
|
26 viewsUpdate 16-Aug-04: The 'too low house man' hired a tractor today to bring the road down. In sorting out his problem he may well be on the way to creating problems for all of the other inhabitants. (01-Jan-04)dozer
|
|
26 viewsSmall bathroom sink.dozer
|
|
26 viewsLarge bathroom.dozer
|
|