|
Most viewed - Original Coolthaihouse Build |
30 viewsCenter section roof truss section. Notice the secondary metal supports. The roof has about 12 metric tons of roof tiles. dozer
|
|
30 viewsPainting a frame. The frames are all painted oak color, where the windows and doors were varnished.dozer
|
|
30 viewsHere is a movie of the house which I made on 06-Jul-04. dozer
|
|
30 viewsThese glass bricks were poorly placed. This goes along with the point about spending more time in the planning phase. When the door is opened, the glass bricks are covered (which defeats their purpose of allowing natural light to filter in. (23-Aug-04)dozer
|
|
29 viewsThe roof has had an extra beam added which runs through the house and cross supports added. (08-Apr-04)dozer
|
|
29 viewsRoof truss - inside view. dozer
|
|
29 viewsThe back bedroom.dozer
|
|
29 viewsThe house as it looks today. (19-May-04)dozer
|
|
29 viewsDecorative work on the entryway. Decorative bricks were placed around the entry posts and cement is used as a border material. (10-Jul-04)dozer
|
|
29 viewsThe surrounding metal has been placed on the perimeter wall and the arrows and leaves are in the process of being painted. The paint used for the decorative elements of the metal are a special yellow primer and gold paint. (31-Jul-04)dozer
|
|
29 viewsThe bathroom base should have been laid out 10 centimeters below the base of the rest of the house. (13-Mar-04)dozer
|
|
29 viewsPumps: This is the pump which pumps out of the tank into the house. It is enclosed an a metal cage which is bolted to the ground. (30-Jul-04)
There are two pumps used, one to pump water out of the well, through the filtration system and into the tank, and one to pump water from the tank to the house. Both pumps are Fujika hiiflow GFS-255.
The other pump is in the filtration cage and pumps water from the well to the tank.dozer
|
|
420 files on 35 page(s) |
|
|
|
5 | |
|
|
|
|
|
|
|
|
|