Most viewed - Original Coolthaihouse Build |
13 viewsAnd it attaches to the support metal framework like this. (06-May-04)dozer
|
|
13 viewsChecking the frame. (07-May-04)dozer
|
|
13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
|
|
13 viewsMetal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer
|
|
13 viewsPost holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozer
|
|
13 viewsAnother view of the back wall. dozer
|
|
13 viewsThe gate track is laid in position. (15-Jul-04)dozer
|
|
12 viewsAfter the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozer
|
|
12 viewsThe finished indoor tile floor. (06-Jul-04)dozer
|
|
12 viewsThe cement under the tile is used to bring the patio flooring to the desired level. (22-Jun-04)dozer
|
|
12 viewsAnother shot of the entry road. It was made with the wrong kind of dirt and is now a muddy mess. The cool thai house is the last one on the left.dozer
|
|
12 viewsInstalling sheetrock. (11-May-04)dozer
|
|