|
Most viewed - Original Coolthaihouse Build |
15 viewsFitting a wall piece in place. (26-Jul-04)dozer
|
|
15 viewsMetal fencing section. (15-Aug-04)dozer
|
|
15 viewsMetal entry door. (22-Aug-04)dozer
|
|
15 viewsThe row of bricks is attached to the wall with strips of rebar for strength. (24-Jun-04)dozer
|
|
15 viewsNearly completed planter box on the front right of the patio.dozer
|
|
14 viewsPour close up. (21-Apr-04)dozer
|
|
14 viewsFor outside surfaces that will not be tiled, they can be done is a semi-smooth, non slippery, finish. (04-Jun-04)dozer
|
|
14 viewsAfter the floor is poured a layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
|
|
14 viewsThis shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer
|
|
14 viewsHere is the front bedroom partially tiled. dozer
|
|
14 viewsHere I'm just wondering how much worse can the road actually get before someone does something. (31-May-04)dozer
|
|
14 viewsCeiling after taping complete.dozer
|
|
420 files on 35 page(s) |
|
|
|
|
|
30 | |
|
|
|
|
|
|
|