|
Most viewed - Original Coolthaihouse Build |
16 viewsHere stucco has been affixed.dozer
|
|
16 viewsThis shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer
|
|
16 viewsThe wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer
|
|
16 viewsBathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer
|
|
16 viewsThe PVC is then cemented in place.dozer
|
|
16 viewsOpening being made for the circuit breaker. (12-May-04)dozer
|
|
16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
|
|
16 viewsA wall section (front and side) with completed support post structures. dozer
|
|
16 viewsMetal being cut at the same time it is welded by another worker.dozer
|
|
16 viewsLaying a row of bricks. (08-Jul-04)dozer
|
|
16 viewsThe planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer
|
|
16 viewsView of planter boxes from patio. (22-Aug-04)dozer
|
|
420 files on 35 page(s) |
|
|
|
|
|
28 | |
|
|
|
|
|
|
|