Most viewed - Original Coolthaihouse Build |
20 viewsPrep work for the septic exhaust cover. (08-Jul-04dozer
|
|
20 viewsSadly the first electrical guy didn't really do too good a job. For example, here we discover the large socket outlet boxes are set in the wrong orientation. (26-May-04)dozer
|
|
20 viewsThis shows a large socket box with 5 small plugs and a telephone connection. The only problem with these small socket receptacles being so close together is you cannot really use two adjacent plugs, because typically plugs will be a bit too wide. dozer
|
|
20 viewsThe well after cementing around the base. (19-Aug-04). dozer
|
|
20 viewsGate section.dozer
|
|
20 viewsInstalling brackets for the 6" gutter sections. (08-Jul-04)dozer
|
|
|
20 viewsAdded the final gutter on top of the patio. (19-Jul-04)dozer
|
|
19 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
|
|
19 viewsThe still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer
|
|
19 viewsThe stucco is applied in coats. This is a rough coat. (02-Apr-04)dozer
|
|
19 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
|
|