21 viewsRoof truss with attached facia board and drainage aluminum at the valley.dozer
DSC00137~0.jpg
21 viewsA wall section of the rear bedroom along. There has been additional metal placed in the roof truss which is now complete. Notice the two heavy gauge 4 * 2 metal beams shown in this shot. (28-Mar-04)dozer
DSC00142.jpg
21 viewsIn the process of placing roof tiles on the house. dozer
DSC00144.jpg
21 viewsRoof tiles being set on the roof. dozer
DSC02134.jpg
21 viewsThis cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozer
DSC04047.jpg
21 viewsA close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozer
DSC04075.jpg
21 viewsA mounted inside solid wood door prior to being varnished.dozer
DSC04130.jpg
21 viewsThe glass needed to be cut for the grate windows with a glass cutter. (27-Jun-04)dozer
DSC02118.jpg
21 viewsFrom the back of the house. (13-May-04)dozer
DSC02119.jpg
21 viewsAnother shot from the back of the house.dozer
DSC00075.jpg
21 viewsThe footing of a foundation column. (29-Feb-04)dozer
DSC00100.jpg
21 viewsThe roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozer