22 viewsA footing is created about 10 inches high by about 10 cm. wide. Straight form wood is used to form the concrete. The concrete is poured around a metal rebar structure, of 3 hun full (vertical) with 2 hun full (cross supports). (16-Jan-04) dozer
|
|
22 viewsTo apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozer
|
|
22 views5 Minutes Saved, the Story of DIRTY WATER!: The well was dug in February, and although I don't have any pictures it was hand dug by an experienced well digger. This shot shows a well digger descending into a hand dug well. The well in our case is about 7 meters deep and uses 23 rings. (09-Apr-04)dozer
|
|
|
22 viewsValve: The floats control the off/on position within the water tank. (19-Aug-04)dozer
|
|
21 viewsWall section in progress. (13-Mar-04)dozer
|
|
21 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer
|
|
21 viewsThe stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer
|
|
21 viewsThe foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer
|
|
21 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
|
|
21 viewsThis area shows the entryway (on the left) as well as the front bedroom. (22-Mar-04)dozer
|
|
21 viewsA piece of wood is extended from the roof metal to allow the facia board to be attached. dozer
|
|