Most viewed - Original Coolthaihouse Build
DSC00031.jpg
22 viewsA footing is created about 10 inches high by about 10 cm. wide. Straight form wood is used to form the concrete. The concrete is poured around a metal rebar structure, of 3 hun full (vertical) with 2 hun full (cross supports). (16-Jan-04) dozer
DSC04139.jpg
22 viewsTo apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozer
DSC01041.jpg
22 views5 Minutes Saved, the Story of DIRTY WATER!: The well was dug in February, and although I don't have any pictures it was hand dug by an experienced well digger. This shot shows a well digger descending into a hand dug well. The well in our case is about 7 meters deep and uses 23 rings. (09-Apr-04)dozer
DSC05128.jpg
22 viewsdozer
DSC05128~1.jpg
22 viewsValve: The floats control the off/on position within the water tank. (19-Aug-04)dozer
DSC00105.jpg
21 viewsWall section in progress. (13-Mar-04)dozer
DSC01049.jpg
21 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer
DSC01056~1.jpg
21 viewsThe stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer
DSC01070.jpg
21 viewsThe foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer
DSC01153.jpg
21 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
DSC00108~0.jpg
21 viewsThis area shows the entryway (on the left) as well as the front bedroom. (22-Mar-04)dozer
DSC00111.jpg
21 viewsA piece of wood is extended from the roof metal to allow the facia board to be attached. dozer