Most viewed - Original Coolthaihouse Build |
24 viewsThe row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer
|
|
24 viewsThe small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer
|
|
24 viewsUnder the patio runs this PVC which feeds the lighting on the wall and then runs to the pumps. (03-Jun-04)dozer
|
|
24 viewsNow we go about placing stone on the outside of the well rings.dozer
|
|
24 viewsAfter the water has been pumped out of the well, you can see a large hole in the bottom which needs to be patched. (24-Jan-04) dozer
|
|
24 viewsLater on the upper part of the well he cemented between the rings to prevent water from flowing in from the sides in the upper portion of the well.dozer
|
|
24 viewsend 5 Minutes Saved, the Story of DIRTY WATER!: Water is such a precious resource. How one short cut which saved the well digger 5 minutes of time could lead to such problems! Oh well, tit (this is Thailand). Now the water is clear as can be seen in this shot. (19-Aug-04) dozer
|
|
23 viewsThe blocks are laid in rows with cement in-between. (28-Mar-04)dozer
|
|
23 viewsThe roof tile is wired on to hold it in place. Notice the tile sits in place on the 1 * 1 metal cross beam. dozer
|
|
23 viewsFront door of house framed. There is a cement base above the door frame. (22-Mar-04)dozer
|
|
23 viewsHeavy duty hinge on an indoor door. (23-Jun-04)dozer
|
|
23 viewsThe front door lockset was installed upside down. It is amazing how many different things which go into a house can actually be installed backwards or upside down. (25-Jun-04)dozer
|
|