happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Most viewed - Original Coolthaihouse Build
DSC03112.jpg
25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
DSC03124.jpg
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
DSC03149.jpg
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
DSC05145.jpg
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
DSC06010.jpg
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
DSC04018.jpg
25 viewsAfter the well was in operation for a while, we started having problems with 'dirty' water. Here the original digger uses a pump to pump out the water at the bottom of the well. (13-Jun-04)dozer
DSC05052~0.jpg
25 viewsThe well after having stones set around the rings and around the base. dozer
DSC05131.jpg
25 viewsFiltration: A sample of the filtration agent, this being magnesium. Each tank is filled with one mineral filtering agent. (19-Aug-04)

The filtration system consists of three canisters each holding a different filtration agent; carbon, magnesium and an ionizer.
dozer
DSC00132.jpg
24 viewsWall section - notice how there is a base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer
DSC00149.jpg
24 viewsThe stucco being smoothed in the finishing coat.dozer
DSC02012.jpg
24 viewsMain roof section nearing completion. (27-Apr-04)dozer
DSC02013.jpg
24 viewsClose-up of underside of roof section. dozer
420 files on 35 page(s) 10

Debug Info 
Debug Output: show / hide