25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
|
|
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
|
|
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
|
|
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
|
|
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
|
|
25 viewsAfter the well was in operation for a while, we started having problems with 'dirty' water. Here the original digger uses a pump to pump out the water at the bottom of the well. (13-Jun-04)dozer
|
|
25 viewsThe well after having stones set around the rings and around the base. dozer
|
|
25 viewsFiltration: A sample of the filtration agent, this being magnesium. Each tank is filled with one mineral filtering agent. (19-Aug-04)
The filtration system consists of three canisters each holding a different filtration agent; carbon, magnesium and an ionizer. dozer
|
|
24 viewsWall section - notice how there is a base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer
|
|
24 viewsThe stucco being smoothed in the finishing coat.dozer
|
|
24 viewsMain roof section nearing completion. (27-Apr-04)dozer
|
|
24 viewsClose-up of underside of roof section. dozer
|
|