happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Most viewed - CTH Maintenance
IMG_3645.jpg
Big Bug20 viewsBig bug aka the ones they sell in the village for 10 baht. dozer
IMG_7513.jpg
Baby Gekko20 viewsdozer
DSC05123.jpg
Original Wall with Metal19 viewsAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer
IMG_2436.jpg
Metal Topped19 viewsThe top of the metal was cut off, here it is being smoothed. dozer
DSC05120p.jpg
Back View Original Room19 viewsThis is a back view of the original roofing made using the Chang brand corrugated roofing sheets.dozer
IMG_2379.jpg
Backside of the Pump House Roof19 viewsThe two pieces of metal are laid in place with the joint on the back side. dozer
IMG_3804.jpg
19 viewsdozer
DSC05126.jpg
Pump House19 viewsThe original pump house with raw water filtration (from a hand dug well) and single pump. The corrugated roof tiles are also visible with the extruding screws. dozer
IMG_7830.jpg
Moth19 viewsThese fly like hummingbirds and have long tounges.dozer
IMG_2372.jpg
Metal Bent18 viewsHere the metal is bent to the specified angle. This angle forms the apex of the roof. dozer
IMG_2387.jpg
Sheeting Riveted into Place18 viewsThe sheeting is riveted into place. dozer
IMG_2664.jpg
Wierd Looking Bug18 viewsdozer
111 files on 10 page(s) 9

Debug Info 
Debug Output: show / hide