Prep Work22 viewsThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer
|
|

Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
|
|

Rebar22 viewsIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer
|
|

Prep Work22 viewsThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer
|
|

Bird Eggs22 viewsBird eggs and banannas.dozer
|
|

Forming Sealing Layer21 viewsThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer
|
|

Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
|
|

Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
|
|

Metal Bending Maching21 viewsHere the metal sheet is inserted into the bending machine to get the angle specified. dozer
|
|

Old Metal21 viewsThe old metal being prepared for the scrap man at 10 b per kilo. dozer
|
|

Big Bug21 viewsBig bug aka the ones they sell in the village for 10 baht. dozer
|
|
|