Most viewed - CTH Maintenance |
Prep Work22 viewsThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer
|
|
Praying Mantis22 viewsdozer
|
|
Buffet22 viewsAt least we finally figured out where all of the fish were going. Later captured and transported to the reservoir.dozer
|
|
Forming Sealing Layer21 viewsThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer
|
|
Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
|
|
Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
|
|
Metal Bending Maching21 viewsHere the metal sheet is inserted into the bending machine to get the angle specified. dozer
|
|
Old Metal21 viewsThe old metal being prepared for the scrap man at 10 b per kilo. dozer
|
|
Bird Eggs21 viewsBird eggs and banannas.dozer
|
|
|
Metal Workshop20 viewsWe were replacing the corrugated roof sheets with metal sheets 1mm thick purchased from the steel shop. The metal will be bent to form the apex of the roof. The metal needs to be cut to size as it is too thick to cut easily on site. dozer
|
|
Original Finish Paint Coat Redone20 viewsThe original paint coat used TOA Glipton oil based paint but was cut too much with thinner or turpentine. Here the surface is being roughed to apply a new coat. dozer
|
|