happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Most viewed - CTH Maintenance
IMG_1304.jpg
Prep Work22 viewsThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer
IMG_3324.jpg
Praying Mantis22 viewsdozer
IMG_8805.jpg
Buffet22 viewsAt least we finally figured out where all of the fish were going. Later captured and transported to the reservoir.dozer
IMG_2892.jpg
Forming Sealing Layer21 viewsThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer
DSC05120.jpg
Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
IMG_2547.jpg
Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
IMG_2371.jpg
Metal Bending Maching21 viewsHere the metal sheet is inserted into the bending machine to get the angle specified. dozer
IMG_1301.jpg
Old Metal21 viewsThe old metal being prepared for the scrap man at 10 b per kilo. dozer
Image008.jpg
Bird Eggs21 viewsBird eggs and banannas.dozer
IMG_1075.jpg
Green Moth21 viewsdozer
IMG_2370.jpg
Metal Workshop20 viewsWe were replacing the corrugated roof sheets with metal sheets 1mm thick purchased from the steel shop. The metal will be bent to form the apex of the roof. The metal needs to be cut to size as it is too thick to cut easily on site. dozer
IMG_3794.jpg
Original Finish Paint Coat Redone20 viewsThe original paint coat used TOA Glipton oil based paint but was cut too much with thinner or turpentine. Here the surface is being roughed to apply a new coat. dozer
111 files on 10 page(s) 8

Debug Info 
Debug Output: show / hide