IMG_2891.jpg
Prep Work22 viewsThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer
IMG_2548p-1.jpg
Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
IMG_1302.jpg
Rebar22 viewsIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer
IMG_1304.jpg
Prep Work22 viewsThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer
Image008.jpg
Bird Eggs22 viewsBird eggs and banannas.dozer
IMG_2892.jpg
Forming Sealing Layer21 viewsThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer
DSC05120.jpg
Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
IMG_2547.jpg
Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
IMG_2371.jpg
Metal Bending Maching21 viewsHere the metal sheet is inserted into the bending machine to get the angle specified. dozer
IMG_1301.jpg
Old Metal21 viewsThe old metal being prepared for the scrap man at 10 b per kilo. dozer
IMG_3645.jpg
Big Bug21 viewsBig bug aka the ones they sell in the village for 10 baht. dozer
IMG_7513.jpg
Baby Gekko21 viewsdozer