|
Most viewed - CTH Maintenance |
Toads24 viewsThese guys were hiding from the rain maybe. At least this time they weren't in my shoe. dozer
|
|
Forming Gutter23 viewsThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
|
|
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
|
|
Megga Gekko23 viewsThis large gekko is eating a bug. dozer
|
|
Elephant23 viewsHey it's a dead end road, where is he going?dozer
|
|
Fish23 viewsOne of the large sucker fish in the outdoor tank. dozer
|
|
Bird23 viewsThis bird had got tangled in some fishing line or something. We saved it.dozer
|
|
Bee Hive23 viewsSmoking out a bee hive in the tool shed.dozer
|
|
Troweling the Surface22 viewsThe finished surface of the upper level of the pour with concrete all around the well. dozer
|
|
Prep Work22 viewsThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer
|
|
Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
|
|
Rebar22 viewsIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer
|
|
111 files on 10 page(s) |
|
|
|
|
|
7 | |
|
|
|
|
|