IMG_1467.jpg
Toads24 viewsThese guys were hiding from the rain maybe. At least this time they weren't in my shoe. dozer
IMG_2883.jpg
Forming Gutter23 viewsThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
IMG_2534.jpg
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
DSCN0223.jpg
Megga Gekko23 viewsThis large gekko is eating a bug. dozer
IMG_0286.jpg
Elephant23 viewsHey it's a dead end road, where is he going?dozer
IMG_2438~0.jpg
Fish23 viewsOne of the large sucker fish in the outdoor tank. dozer
IMG_9695.jpg
Bird23 viewsThis bird had got tangled in some fishing line or something. We saved it.dozer
MVI_0684.mpg
Bee Hive23 viewsSmoking out a bee hive in the tool shed.dozer
IMG_2910.jpg
Troweling the Surface22 viewsThe finished surface of the upper level of the pour with concrete all around the well. dozer
IMG_2891.jpg
Prep Work22 viewsThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer
IMG_2548p-1.jpg
Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
IMG_1302.jpg
Rebar22 viewsIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer