happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Most viewed - CTH Maintenance
IMG_2518.jpg
Close up of the finished beam24 viewsdozer
DSCN0223.jpg
Megga Gekko24 viewsThis large gekko is eating a bug. dozer
IMG_0286.jpg
Elephant24 viewsHey it's a dead end road, where is he going?dozer
IMG_2438~0.jpg
Fish24 viewsOne of the large sucker fish in the outdoor tank. dozer
IMG_9695.jpg
Bird24 viewsThis bird had got tangled in some fishing line or something. We saved it.dozer
MVI_0684.mpg
Bee Hive24 viewsSmoking out a bee hive in the tool shed.dozer
IMG_2883.jpg
Forming Gutter23 viewsThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
IMG_2534.jpg
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
IMG_1075.jpg
Green Moth23 viewsdozer
IMG_3324.jpg
Praying Mantis23 viewsdozer
IMG_8805.jpg
Buffet23 viewsAt least we finally figured out where all of the fish were going. Later captured and transported to the reservoir.dozer
IMG_2910.jpg
Troweling the Surface22 viewsThe finished surface of the upper level of the pour with concrete all around the well. dozer
111 files on 10 page(s) 7

Debug Info 
Debug Output: show / hide