happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Most viewed - CTH Maintenance
IMG_3223.jpg
Old Gate27 viewsThis gate was really heavy, maybe 200kg or more. It opened OK without too much effort due to stainless wheels, but was due for an upgrade.dozer
IMG_3277.jpg
Latch Post27 viewsInstalling and polishing the stainless latch post.dozer
IMG_3281.jpg
Polishing a Weld27 viewsdozer
IMG_2446.jpg
Formwork27 viewsdozer
IMG_2451.jpg
Fabricating Security Metal27 viewsThe security metal will be bolted on top of the finished wall. dozer
IMG_1303.jpg
Rebar27 viewsShows how the rebar was affixed laterally and vertically for the modification. dozer
IMG_3269.jpg
Rendered Prior to Paint26 viewsdozer
IMG_2447.jpg
Ribs being Attached to Frame26 viewsThe lateral support members are wired in place each 20 centimeters. dozer
IMG_2517.jpg
Smoothing the Underside of the Beam26 viewsdozer
IMG_2594.jpg
Security Metal affixed to Top of Wall26 viewsThis security metal was fabricated here and then attached via anchor bolts. dozer
IMG_2597.jpg
Welding Security Metal26 viewsMost of the welding was done prior to putting each section in place (each section being more than 2 meters). Here two adjacent sections are being welded together. dozer
DSC05124.jpg
Original Wall26 viewsThe original side wall being raised. dozer
111 files on 10 page(s) 5

Debug Info 
Debug Output: show / hide