|

Most viewed - CTH Maintenance |

Old Gate27 viewsThis gate was really heavy, maybe 200kg or more. It opened OK without too much effort due to stainless wheels, but was due for an upgrade.dozer
|
|

Latch Post27 viewsInstalling and polishing the stainless latch post.dozer
|
|

Polishing a Weld27 viewsdozer
|
|
|

Fabricating Security Metal27 viewsThe security metal will be bolted on top of the finished wall. dozer
|
|

Rebar27 viewsShows how the rebar was affixed laterally and vertically for the modification. dozer
|
|

Stick27 viewsLong stick bug.dozer
|
|

Rendered Prior to Paint26 viewsdozer
|
|

Ribs being Attached to Frame26 viewsThe lateral support members are wired in place each 20 centimeters. dozer
|
|

Smoothing the Underside of the Beam26 viewsdozer
|
|

Security Metal affixed to Top of Wall26 viewsThis security metal was fabricated here and then attached via anchor bolts. dozer
|
|

Welding Security Metal26 viewsMost of the welding was done prior to putting each section in place (each section being more than 2 meters). Here two adjacent sections are being welded together. dozer
|
|
111 files on 10 page(s) |
 |
 |
 |
5 |  |
 |
 |
 |
|

|
|
|