happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Most viewed - CTH Maintenance
IMG_3330.jpg
Ceiling Structure43 viewsNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozer
IMG_3331.jpg
Prefab Opening43 viewsThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozer
IMG_3318.jpg
Wood Doors42 viewsSeveral of the wood doors had swollen and needed to be shaved, some were re-hung and then a oil based paint (Glipton TOA) was used. Since they are not teak they look much better with a solid coat and it also help protects them. dozer
IMG_3326.jpg
Ceiling Replacement42 viewsThe existing ceiling was removed and a new straight line established for the new ceiling. dozer
IMG_3335.jpg
Ceiling Service Entry42 viewsThe installer finishes around the service entry area. dozer
IMG_3756.jpg
Drainage42 viewsWall opened at certain places to allow for drainage.dozer
IMG_3762.jpg
Drainage42 viewsBefore being cemented into place it rained, and we enjoyed seeing that the drainage in use. Min. 3" PVC is used for drainage.1 commentsdozer
IMG_3328.jpg
Ceiling Line41 viewsThe red line shows the new straight line for the ceiling. dozer
IMG_3466.jpg
Electric: Original funky outlets41 viewsThese were the original funky outlets installed throughout the house. There is inadequate space to use all of the individual outlets. dozer
IMG_3467.jpg
New Outlets41 viewsNet Bticino face plate and outlets. dozer
IMG_3332.jpg
Installing Drywall39 viewsThe drywall we used was the premium moisture resistant Chang brand. Here it is being screwed into the support structure. dozer
IMG_3472.jpg
Electric: New Fan39 viewsA new Regene fan is being installed in the study to replace an old fan that wasn't working. dozer
111 files on 10 page(s) 1

Debug Info 
Debug Output: show / hide