|
Most viewed - Renovations and Maintenance |
Drive Way Repair36 viewsGrout is applied on either side of the track.
dozer
|
|
Original Front Gate36 viewsA kind of typical entry gate, ugly metal variety. This is after one of the neighbors dozed all the dirt out of the road (ergo the level of the road looks a little funny).dozer
|
|
True Line36 viewsA true line indicating where the edge of the tile should be. dozer
|
|
Putty Applied36 viewsWall putty is applied to smooth the area where the new electric outlet is. dozer
|
|
Original Bathrooom36 viewsThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer
|
|
Fan Parts35 viewsHere the fan is prepped for installation.dozer
|
|
Leveling the Tiles35 viewsLeveling the tiles in place after they are laid. dozer
|
|
Shower Curtain and Tub34 viewsThe shower curtain and tub, covered in old dust and grime. dozer
|
|
Applying the Slurry Mix34 viewsApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozer
|
|
Original View Bathtub34 viewsThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozer
|
|
Edging the Upper Beam33 viewsAfter the beam has set now it is being cornered. dozer
|
|
Before Unoccupied Condo33 viewsThis condo had not been occupied in several years and was as originally built except that everything in the condo had deteriorated.dozer
|
|
192 files on 16 page(s) |
|
|
|
|
|
8 | |
|
|
|
|
|
|
|