Installing the Wood Structure48 viewsThe wood work is done offsite and then brought in and installed in pieces. The electric which feeds in will support the LED lighting. dozer
|
|

Walkthrough of Finished Condo47 viewsA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer
|
|

Ceiling47 viewsPlastering up the joints and screw heads in the new ceiling.dozer
|
|

Wall Tiles47 viewsThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer
|
|

Wall Tile47 viewsWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer
|
|

New Electric Receptacle46 viewsA new electric receptacle is established. dozer
|
|

Original Kitchen Granite46 viewsThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer
|
|

Trim Piece45 viewsInstalling the aluminum trim piece.dozer
|
|

Original View Toilet44 viewsThe original view of the toilet and stained tile area.dozer
|
|

Flintkote44 viewsA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozer
|
|

Sink44 viewsThe sink is left to dry after it is installed along with the granite counter top.dozer
|
|

Ceiling Structure43 viewsNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozer
|
|