|

Most viewed - Renovations and Maintenance |

Installing Square D Panel56 viewsInstalling the 6 station square D panel.dozer
|
|

Close Up of Finished Wood Work55 viewsThere is a left shelf and framed mirror along with the top ornamental lamp station. The lighting on top is LED lights.dozer
|
|

Floor Level53 viewsThe floor is poured level in preparation of the floor tiles.dozer
|
|

Toilet Adjustor53 viewsThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer
|
|

Flintkote52 viewsStarting to flintkote the floor area. dozer
|
|

Flintkote52 viewsAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozer
|
|

Electric in Ceiling50 viewsLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer
|
|

Laying in the Plumbing49 viewsEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozer
|
|

Preparing for New Control Box49 viewsPreparing the wiring for a new square D electrical panel.dozer
|
|

Granite Faucet Hole48 viewsOn site drilling of the faucet hole for the granite counter.dozer
|
|

Granite Skirting48 viewsInstalling and adjusting the position of the granite skirting on the front of the under mount sink.dozer
|
|

Wood Frame48 viewsThe wood is teak plywood on top of a frame made of furniture wood.dozer
|
|
192 files on 16 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
|

|
|
|