happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance

Most viewed - Renovations and Maintenance
IMG_2881.jpg
Rerouted Electrical25 viewsSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. 1 commentsdozer
IMG_2567.jpg
Column Lighting25 viewsElectrician preparing to install the lighting on the top of each column. dozer
IMG_1735.jpg
Red Ant Nest25 viewsThey are fun when they aren't in your yard. dozer
IMG_2653.jpg
caterpillar25 viewsdozer
IMG_2875.jpg
Concrete Removed24 viewsAll of the old top concrete layer was busted out and removed.dozer
DSC05052.jpg
Original Well24 viewsThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer
IMG_2438.jpg
Scrap24 viewsThe part cut off, to be sold for scrap.dozer
IMG_2444.jpg
Form Work and Rebar Frame24 viewsThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer
IMG_2518.jpg
Close up of the finished beam24 viewsdozer
IMG_1467.jpg
Toads24 viewsThese guys were hiding from the rain maybe. At least this time they weren't in my shoe. dozer
IMG_2883.jpg
Forming Gutter23 viewsThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
IMG_2534.jpg
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
192 files on 16 page(s) 13

Debug Info 
Debug Output: show / hide