|
Most viewed - Renovations and Maintenance |
Rerouted Electrical25 viewsSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. dozer
|
|
Column Lighting25 viewsElectrician preparing to install the lighting on the top of each column. dozer
|
|
Red Ant Nest25 viewsThey are fun when they aren't in your yard. dozer
|
|
|
Concrete Removed24 viewsAll of the old top concrete layer was busted out and removed.dozer
|
|
Original Well24 viewsThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer
|
|
Scrap24 viewsThe part cut off, to be sold for scrap.dozer
|
|
Form Work and Rebar Frame24 viewsThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer
|
|
Close up of the finished beam24 viewsdozer
|
|
Toads24 viewsThese guys were hiding from the rain maybe. At least this time they weren't in my shoe. dozer
|
|
Forming Gutter23 viewsThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
|
|
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
|
|
192 files on 16 page(s) |
|
|
|
|
|
|
|
13 | |
|
|
|
|
|